Sunday, January 30, 2011

Inside jobs

Lars is back! Things move at a much faster pace with three guys on the job ... go figure. Here the three (Lars, Evan & Chris) are installing the last of the basement level doors including a metal fire door (required by zoning) into Chris' workshop.

It took all six hands to get the "batten" portion of the red ceiling area in place. They were measuring every cut with with a laser and precision of the highest order was the mandated by Lars. Chris and I are really pleased with the final look of the ceiling. The little right hand picture is of the framing and start of plumbing pipe in the master bath upstairs. I have travelled to Colorado Springs and researched porcelain fixtures and that stuff will come, by and by ... everything in white.